Leasing your land for a solar plant: what landowners should know

What solar developers look for, how land leases usually work, and what to check before you sign.

Grow Capital team30 October 2026 2 min read

A solar plant on green farmland

Tamil Nadu has a large and growing number of solar plants, and the companies that build them need land. If you own land that is not being used fully, leasing it for a solar plant can give you a steady income for many years.

What developers look for

  • Flat or gently sloping land, with no shade from hills or tall trees
  • Enough land in one block; most plants need several acres
  • A road to the land for trucks during construction
  • An electricity substation not too far away, to connect the plant
  • Clear title, with the patta in the owner's name

How a solar lease usually works

The developer leases the land for a long period, often 20 to 30 years, which is the working life of the plant. You receive lease rent at the agreed times, usually with an agreed increase every few years. The developer builds, runs and maintains the plant, and returns the land at the end.

Check before you sign

  • The lease period, the rent and how it increases
  • Who pays the land tax, and for any change in land use
  • What happens if the developer stops paying or leaves early
  • That the land is returned in usable condition at the end
  • That the lease is registered, as long leases must be

Have the lease checked before you sign. Our legal verification team can go through the papers with you.

We are looking for land

Grow Capital works with solar developers and is looking for land in and around Madurai and across Tamil Nadu. If you have land to offer, send us the location and size, and our team will call you.

General information for Tamil Nadu. Rules and fees can change; check your own case with us or the department.

Questions about this topic

Straight answers to what people ask us most. Still unsure? Call or WhatsApp us.

Ask us a question
How much land is needed for a solar plant?

It depends on the plant's size. Most plants need several acres of flat land in one block, close to an electricity substation.

How long is a solar land lease?

Usually 20 to 30 years, the working life of the plant, with rent paid at agreed times and an agreed increase.

Can agricultural land be leased for solar?

Often, yes, subject to the rules on land use. Check the requirements for your land before you sign.

How do I offer my land for a solar plant?

Send Grow Capital the location and size of your land through the enquiry form or WhatsApp, and our team will call you.

Want us to help?

Our team can do this for you, or go through your papers with you.

Mon to Sat, 10:00 AM to 6:00 PM